Eastbound Views
I-291 begins at I-91 and runs east to the Connecticut River.
Photos taken March 2024.
The Bissell Bridge carries I-291 across the Connecticut River.
Photos taken March 2024.
Exit 4 is for John Fitch Boulevard (US 5).
Photos taken March 2024.
Exit 5 is for Tolland Turnpike.
Photos taken March 2024.
I-291 ends here at the Wilbur Cross Highway (I-84). Use the left lane to go east or the right lane to go west.
Photos taken March 2024.