Hutchinson Parkway
Northbound Views (Archived)
These pictures show the Hutchinson Parkway northbound as it appeared before the exits were renumbered to use a milepost system.
Photos taken 2014-2020.
These pictures show the Hutchinson Parkway northbound as it appeared while the exit renumbering project was in progress. The new signs had been installed but temporarily displayed the old exit numbers until the work was complete.
Photos taken April-September 2021.
Exit 2 for Bartow Avenue opened to traffic in 2024. These pictures show the area as it appeared before construction work began to add the exit.
Photos taken September 2021.
These old button-copy signs used to mark exit 1. They have been replaced with new reflective signs that give the exit number and read "Bruckner Boulevard" instead of "Local Streets."
Photos taken November 2006.
This old button-copy sign for exit 9 has been replaced.
Photo taken March 2007.
This overpass carried East Third Street over the parkway between exit 9 and exit 12. It has been replaced.
Photo taken March 2007.
These signs for exit 17 were replaced with new ones on which there is a box around the name of North Avenue.
Photos taken August 2005.
These signs used to mark exit 22. They have been replaced.
Photos taken August 2005.
This sign used to mark exit 25. It has been replaced.
Photo taken June 2008.
The signage here has been modified to reflect the renaming of the Tappan Zee Bridge to become the Governor Mario M. Cuomo Bridge.
Photo taken June 2008.
These signs used to mark exit 26W and the split for I-684. They have been replaced with new ones.
Photo taken August 2005.
A low clearance sign has been installed on the right-hand side of this sign bridge.
Photo taken June 2008.
This sign for Port Chester has been removed.
Photo taken June 2008.