Grand Central Parkway
Eastbound Views (Archived)
These signs, which were found at the beginning of the Grand Central Parkway, have been replaced. At the time, the section of I-278 between the RFK Bridge, which was then known as the Triboro Bridge, and the beginning of the Brooklyn-Queens Expressway was considered to be part of the Grand Central Parkway and assigned exit numbers accordingly. Motorists wishing to follow I-278 westbound had to take exit 4 from the Grand Central Parkway.
Photos taken April 2004.
These signs for the exits for La Guardia Airport were updated after construction work to modernize the airport was completed.
Photos taken July 2017.
The sign of the left for shuttle flights from La Guardia Airport has been replaced.
Photo taken March 2013.
These pictures show the Grand Central Parkway in the vicinity of La Guardia Airport as it appeared before construction work began to modernize the airport.
Photos taken December 2015.
These signs used to mark exits 6-9E. They were replaced in 2012.
Photos taken 2005-2010.
The sign on the left has replaced with one giving updated terminal information for La Guardia Airport.
Photo taken December 2015.
These signs have been modified to remove the line for airport parking at exit 6.
Photos taken December 2017.
These signs used to mark exit 9E. They were replaced in 2004.
Photos taken April 2004.
These pictures show the parkway eastbound at exits 6-9E while construction work was in progress on this section.
Photos taken March 2013.
These pictures show the Grand Central Parkway eastbound at exits 10-11 as it appeared while construction work was in progress to rehabilitate this section.
Photos taken December 2015.
These pictures show the Grand Central Parkway eastbound at exits 12-16 as it appeared before work began to reconstruct the Kew Gardens Interchange.
Photos taken December 2015.
These signs, most of which were old button-copy signs, used to mark exits 18-25. They have all been replaced.
Photos taken March 2007.
These pictures show some of the electronic signs along the parkway giving the estimated travel times to various exits at a point when they had been installed but were not yet functional.
Photos taken March 2013.
These signs for exit 19 were replaced with new ones that are not in all capital letters.
Photos taken July 2010.
Signs for the curve ahead were installed here since this picture was taken.
Photo taken March 2007.
A new sign for exit 18 has been installed on the overpass in the first picture, while the sign in the second picture has been removed.
Photos taken March 2013.
This picture shows the gas station along the Grand Central Parkway when it was a Mobil station. It is now a Gulf station.
Photo taken July 2010.
This picture show the Grand Central Parkway eastbound at exit 20B as it appeared before an exit only lane was added.
Photo taken December 2015.
The signs shown in these pictures have been replaced with new ones that have their exit tabs aligned slightly differently and have the word "island" abbreviated.
Photos taken March 2013.
This sign for the Douglaston Golf Course has been replaced.
Photo taken March 2013.